"Could 2024 Be A Breakout Year For The Transmission Grid?"
"Study after study has found the country can’t build renewable energy at the pace needed to rapidly decarbonize the power grid without also building a massive amount of new power lines, fast. But over the past half-decade, grid growth has slowed, not accelerated, bogged down by conflicts over siting, permitting and paying for new transmission capacity."